Engineering
-
Wastewater Treatment System for Gul Ahmed Textile Co., Ltd
Location: Karachi, Pakistan Year: 2006 Capacity: 4500 m3/d Process: Physical & chemical treatment + biological contact oxidation Project Description: The project included the design of the wastewater treatment plant (WWTP), procurement of equipment, installation, and commissioning of a wastewater treatment system which collected and treated all wastewater from the textile mill. EASEN, in association with our Chinese partner, Hua’an Design Institute, completed this wastewater treatment system. Effluent COD is 200mg/L, BOD<30mg/L, SS<70mg/L. Please proceed to Water and Wastewater Treatment for more information, or enquire with us through any of our offices listed in the Contact Us section.
- « first
- ‹ previous
- 1
- 2
- 3
- 4