Consulting
-
ADB Loan Demonstration of Guangxi Elderly Care and Health Care Integration and Public-Private Partnership Project
The ADB Loan Demonstration of Guangxi Elderly Care and Health Care Integration and Public-Private Partnership Project X-CS4: Technical Capacity Development in Elderly Care Sector Contract is made on the 15th day of the month of August, 2023, between, on the one hand, Guangxi Foreign Loan Projects Management Office (GPMO) and, on the other hand, a Joint Venture of Easen International Co., Ltd and Jiangxi Provincial Changtian Healthcare Investment Group Co.,Ltd. and Silver Age (Beijing) Health Consulting Co.,Ltd. The total investment of the project is approximately RMB 1.2986 billion, of which the equivalent of USD 100 million is a loan from the Asian Development Bank (ADB). This project has six main contents, namely (i) strengthening the discharge management system (PIEs) of the target hospital; (ii) Construct five elderly care institutions in Hezhou City and Nanning City, and construct a medical institution in Nanning City with a design suitable for the elderly and gender sensitive medical facilities; (iii) Building elderly care institutions to operate elderly care facilities; (iv) Strengthen the ability of PIE to provide appropriate rehabilitation treatment (physical, occupational, and speech therapy); (v) Strengthen the ability of PIE operated elderly care institutions to fully provide nursing services, such as daily life care, dementia care, and end-of-life care; Develop a capacity building plan for PIE and (vi) further enhance its capabilities to ensure proper and sustainable operation and provision of nursing services. This project will construct and operate elderly care institutions in Hezhou City through PPP to support the provision of medical services. -
ADB Loan Guangxi Wuzhou Health and Elderly Friendly City Development Project
The Easen Environment and the Office of the Leading Group for International Financial Organizations and Foreign Government Loan Project Management in Wuzhou City signed a project management and capacity building consulting service contract for the Guangxi Wuzhou Health and Elderly Friendly City Development Project funded by the Asian Development Bank in November 2023. Wuzhou City, Guangxi Zhuang Autonomous Region has obtained a loan of 100 million US dollars from the Asian Development Bank (hereinafter referred to as the "ADB") for the implementation of the "Wuzhou Healthy City and Elderly Friendly City Development Project" (hereinafter referred to as the "Project"). The Asian Development Bank hired a project preparation team to conduct a comprehensive technical evaluation of the project based on the project proposal and feasibility study results prepared by the Wuzhou Municipal Government. After that, they reached an agreement with the Wuzhou City on the overall design of the project. The Asian Development Bank loan project in Wuzhou adopts a "results based lending" (RBL) model. To this end, the Wuzhou Municipal Government formulated the "Wuzhou Health and Age Friendly City Action Plan (2021-2025)" in April 2022 as an RBL project funded by the Asian Development Bank. The timeline of the RBL project coincides with the second phase of the Healthy Wuzhou 2030, which is the "deepening and acceleration" phase. The RBL project covers three central urban areas in Wuzhou City, including Changzhou District, Longwei District, and Wanxiu District. The estimated total investment of the project is 1.3730.8 billion US dollars, including a loan of 100 million US dollars from the Asian Development Bank and a support of 1.2730.8 billion US dollars from the Wuzhou Municipal Government. The implementation period coincides with the 14th Five Year Plan, which is 2021-2025. Wuzhou City successfully implemented the "Guangxi Wuzhou Urban Development Project" funded by the Asian Development Bank from 2009 to 2017, with a focus on comprehensive improvement of geological disasters and resettlement, construction of the road network and related infrastructure in Hongling New Area, establishment of a disaster warning and forecasting system, as well as project management and capacity building. This project uses the traditional investment project model. This project is the first health and age friendly city development project launched by the Asian Development Bank in China, and it is also one of the early RBL projects launched by the Asian Development Bank in China. It is also the first project carried out by Wuzhou City in the field of health and friendly city construction, using the RBL model. In order to support the smooth implementation of the project, three consulting services are planned to be recruited under the project: 1) Initiate support for individual experts - before the loan takes effect, the Asian Development Bank will invest in hiring four independent experts to assist the project office. These four expert positions are: environmental expert, resettlement expert, social and gender expert, and financial management expert. 2) The independent verification agency - Wuzhou Project Office will represent the Wuzhou Municipal Government in recruiting an independent verification agency, which will be responsible for independently verifying the "payment related indicators" according to the "verification agreement". 3) Project Management and Capacity Building Consulting Services - The Wuzhou Project Office will represent the Wuzhou Municipal Government in recruiting a consulting firm. During the implementation process, in accordance with the policies and regulations, loan agreements, and project agreements of the Asian Development Bank and the Chinese government, it will provide comprehensive and full process technical support to the project executing agency, project leadership group, Wuzhou Project Office, implementing agency, and implementing unit in project management and capacity building. The impact of the project is to improve the livability, age friendliness, and social inclusiveness of the core urban area of Wuzhou. The main outputs include: 1) establishing a healthy and safe four generation urbanization environment; 2) Enhance elderly friendly comprehensive services and facilities; 3) Institutional strengthening and capacity building; 4) Improving urban environment and hygiene; 5) Upgrade parks, green spaces, and leisure and fitness facilities; Demonstration of "Vitality Block"; 6) Safe, accessible, pedestrian friendly streets, pedestrian crossings, and sidewalks; 7) Developing elderly care services (community and home-based elderly care, institutional elderly care) with the participation of the private sector; 8) Promoting a healthy lifestyle; 9) Strategic planning, research, and capacity building. The Wuzhou Municipal Government is the project executing agency. The Wuzhou Municipal Government has established a cross departmental project leadership group led by the Executive Vice Mayor. The Office of the Project Leadership Group (referred to as the "Wuzhou Project Office") is located in the Development and Reform Commission of Wuzhou City. The implementing agencies include the Development and Reform Commission of Wuzhou City, the Civil Affairs Bureau of Wuzhou City, the Health Commission of Wuzhou City, the Urban Management and Supervision Bureau of Wuzhou City, and the Culture, Radio, Television, Sports and Tourism Bureau of Wuzhou City. Consulting services: During the project implementation period, the project management and capacity building consultant will assist the project executing agency, project office, and project implementing agency in providing technical support for project implementation in accordance with the requirements of the Asian Development Bank, including but not limited to the following aspects: 1) Project Implementation Plan: Develop annual and quarterly implementation goals and plans, including consulting services 2) Degree plan, project action plan schedule, payment related indicators and payment plan, etc. 3) Project Management Manual: Develop a project management manual to determine the procedures and tasks for project implementation, 4) Clarify the responsibilities of each department, etc. 5) Financial management support: including preparing payment requests to the Asian Development Bank and calculating the funding of project implementation units 6) Allocation of funds, estimation of investments for various categories and overall projects, etc. 7) Project Management and Financial Management Information System: Assist the project office in establishing a financial management system that tracks project performance, loan payments, and matching funds in place; Assist project implementation agencies and units in preparing annual financial and audit reports that comply with domestic and ADB requirements. 8) Project Action Plan: Guide, supervise, and monitor the implementation of the project action plan. 9) Implementation of environmental and social security actions: guide, supervise, and monitor the implementation of environmental and social security actions, and prepare semi annual monitoring reports. 10) Project Performance: Monitor and supervise the performance of loan agreements, project agreements, and other agreements. 11) Project performance monitoring: Regularly update the project design and monitoring framework, develop a project performance monitoring system, and regularly monitor project outputs, outcomes, and impacts. 12) Vitality Block: Guide and supervise the construction and operation of vitality blocks. 13) ADB loan inspection and daily communication: Prepare the necessary materials and reports for ADB annual inspection, mid-term inspection, and completion inspection, and assist the project office in preparing the loan inspection schedule. Maintain daily communication with the Asian Development Bank. 14) Capacity building: Evaluate the capacity building needs of project implementation units and other relevant departments, prepare and organize the implementation of capacity building plans, including but not limited to domestic and foreign training and inspections. 15) Knowledge product development and project outcome dissemination: Identify innovation points under the project, including health and elderly friendly areas, RBL model innovation points in urban development, and develop knowledge products. Summarize project results. Assist the project office in disseminating project innovation points and achievements. 16) Monitoring and reporting: Regularly monitor the progress of various aspects of project implementation, prepare quarterly, semi annual, and annual progress reports, as well as mid-term and completion reports. 17) Problems and suggestions: Identify problems in the project implementation process in a timely manner and provide solutions. -
ADB Loan Fujian Xianyou Mulan River Basin Integrated Ecological Improvement and Environmental Management Project
Easen and the Management Office of the ADB Loan Project for Soil and Water Conservation and Rural Development in Xianyou County, Fujian Province signed a consulting service contract in September 2023 regarding the ADB Loan Project for Comprehensive Ecological Environment Management and Improvement in the Mulan River Basin of Xianyou County, Fujian Province On August 26, 2022, the Asian Development Bank approved a loan of 190 million euros (equivalent to 200 million US dollars) from its ordinary capital resources for the comprehensive ecological improvement and environmental management project in the Mulan River Basin in Xianyou, Fujian. The loan and project agreement was signed on November 11, 2022, and the loan became effective on February 10, 2023. The project will be actually completed on November 30, 2028, and the loan will end on May 31, 2029. This project meets the following impacts: ecological restoration and rural livelihoods are strengthened. The project will achieve the following results: the ecological and environmental risks in the Mulan River Basin will be alleviated. The consulting service will start based on the start date and will continue until May 31, 2029. The consulting services for project management and technical support will include but are not limited to: (1) project management; (2) Provide convenience for the selection and final determination of sub projects and sub borrowers under financial intermediary loans; (3) Provide convenience for procurement, payment, and contract management; (4) Construction management, including planning, supervision, and monitoring; (5) Financial management, including facilitating loan disbursement applications and preparing annual project financial statements; (6) Project performance monitoring and reporting requirements, including regular preparation of project progress reports in a format acceptable to the Asian Development Bank; (7) Security management and monitoring, including regular monitoring reports specified in the Environmental and Social Security Management System (ESMS); (8) Promote the implementation of social action plans, gender action plans, and environmental management development plans; (9) Assist the project office and relevant departments in carrying out public participation and consultation, raising public awareness of environmental protection, education and knowledge sharing activities, and training; (10) Evaluate the project execution status during the mid-term and completion stages; And (11) provide convenience for the regular visit of the Asian Development Bank to review project progress. -
ADB Loan Shanxi Urban- Rural Water Source Protection and Environmental Demonstration Project
The Management Office of Easen Environment and Shanxi Urban and Rural Water Source Protection and Environmental Improvement Demonstration Project signed a consulting service contract in April 2023 regarding the Shanxi Urban and Rural Water Source Protection and Environmental Improvement Demonstration Project. The Asian Development Bank approved a loan of $100 million to the government of the People's Republic of China on December 31, 2017, to fund the urban and rural water conservancy and environmental demonstration project in Shanxi Province. The project will be implemented by the Shanxi Provincial Government through the Jinzhong City Government and the Zuoquan County Government. Through the implementation of the project, (i) the operation of Shixia Reservoir and the improvement of its watershed vegetation, (ii) the restoration of Qingzhang River and Binhe Road, (iii) inclusive water supply and wastewater collection services, and (iv) institutional capacity has been strengthened, thereby improving the living and environmental conditions of urban and rural residents in Zuoquan County. Consulting service content: 1) Analyzing the current situation and development goals of urban-rural water supply integration from four levels: national, provincial, Shanxi, and Zuoquan 2) Evaluate the current performance of the entire service area and develop a business improvement plan to improve and coordinate service standards; 3) Review the financial management status of the water company, including organizational structure, human resources, and control systems; And propose suggestions for improving financial management in response to existing problems; 4) Design and operate an organizational structure for water supply utilities, and determine employee responsibilities for key positions; 5) Review and upgrade billing and revenue collection systems; 6) Establish financial forecasts for water supply facilities; 7) Assist in developing capital investment plans that are linked to current performance and take into account changes in future demand; 8) Assist in developing asset management plans; 9) Provide suggestions for the management information system of the water company; 10) Develop a water demand management framework; And assist designated institutions in developing comprehensive water resource demand management plans for each water sector: agriculture; Commercial, domestic, and industrial; and 11) Provide technical advice to designated institutions on the implementation of water resource management activities, including industry water efficiency plans; Repair and maintain agricultural storage and transportation infrastructure; Development and distribution of information, education, and communication materials; Monitoring and reducing non renewable water usage in water supply facilities; 12) Assist water supply companies in enhancing their ability to manage and operate large-scale water supply systems in a technically and financially sustainable manner 13) Upgrade and improve water safety plans to identify potential risks of low drinking water quality and assist in implementing risk control and mitigation measures 14) Evaluate and draft a comprehensive non revenue water management plan 15) Conduct a survey on water price willingness to assist the government in formulating appropriate water prices and water price adjustment mechanisms 16) Determine detailed capacity development requirements for sustainable water supply infrastructure services and governance, organize and provide training on operation and maintenance, water supply management planning, water supply safety, water resource protection, and water conservation, and propose a training plan list 17) Organize seminars and domestic inspections to learn from the experience of other projects and improve the management level of the organization; 18) The research needs to meet the relevant requirements of the PAM for this Asian Development Bank project. -
KfW Development Bank Loan Tiandong County Living Environment Integrated Rehabilitation Project
The estimated total project cost ("total cost") is approximately 110 million euros. The loan amount from the German Bank for Reconstruction and Development (KfW) is 80 million euros. It will also improve urban and rural living conditions, which is an important factor for the further development of Tiandong County. The overall goal of this project will be achieved through the implementation of two sub projects: the urban drainage system renovation sub project and the rural sewage treatment sub project. The main task of the consulting team is to support the project office, China Design Institute, and Window Company in the project preparation and implementation process, such as thoroughly reviewing the preliminary and detailed design, reviewing the contract and commercial parts of the bidding documents, assisting the project office, China Design Institute, and Window Company in the smooth execution of the contract (latest cost and financing table, payment schedule, guarantee of all relevant environmental and social protection measures, on-site inspection, quality inspection) .